亚洲欧洲中文日韩久久Av乱码,欧美巨大另类极品videosbest,无码人妻一区二区三区一,欧洲成人午夜精品无码区久久

粘結(jié)砂漿

發(fā)布日期:2019-07-17 12:18:27 所屬欄目:保溫砂漿系統(tǒng)

粘結(jié)砂漿.png

粘結(jié)砂漿(Bonded mortar

一、產(chǎn)品用途:

 用于外墻保溫系統(tǒng)中聚苯板,擠塑板,保溫一體板,水泥發(fā)泡板等的粘貼。

二、 產(chǎn)品特點:

1. 該產(chǎn)品無毒無味、安全環(huán)保。

2. 施工方便,現(xiàn)場加適量水配制成漿狀即可施工。

3. 保水性能好,粘結(jié)強(qiáng)度高,施工中不滑墜。

4. 具有優(yōu)良的耐候性、抗沖擊和防裂性能。 

三、粘結(jié)砂漿執(zhí)行標(biāo)準(zhǔn):

JG 149-2003《膨脹聚苯板薄抹灰外墻外保溫系統(tǒng)》

四、施工方法:

    基層處理:基層表面粉塵、油污必須清除干凈,以免影響粘結(jié)強(qiáng)度。

用水將粘合劑調(diào)成厚糊狀,水為1,干粉為44.5理論用量當(dāng)涂層厚度為35mm時,約46kg/m2將粘合劑充分?jǐn)嚢杈鶆?,靜置510分鐘,粘合劑會變稠,此時再稍后加攪拌即可使用。將拌勻后的保溫板專用粘合劑用泥板涂抹在保溫板背面或混凝土基層面上,粘貼時拍實鋪平,撥正,擦清板面。

五、技術(shù)指標(biāo):

項    目性能指標(biāo)

拉伸粘結(jié)強(qiáng)度/Mpa

(與水泥砂漿)

未處理≥0.6
浸水處理≥0.40

拉伸粘結(jié)強(qiáng)度/Mpa

(與膨脹聚苯板)

未處理≥0.10,破壞界面在膨脹聚苯板上
浸水處理
可操作時間/h≥2
抗裂性5mm以下無裂紋


六、注意事項:

  1、施工溫度5℃-35℃,風(fēng)力不大于5,施工過程中應(yīng)避免雨淋

  2、拌好的物料應(yīng)在2小時內(nèi)用完,忌再次攪拌或加入水和其它材料攪拌。

3、未開封保存陰涼干燥處,保質(zhì)期6個月。

Product use:

It is used for pasting polystyrene board, extruding board, thermal insulation board, cement foamed plate and so on in exterior wall insulation system.

 

Product features:

1. the product is nontoxic, tasteless, safe and environmentally friendly

2. the construction is convenient, and the site plus a proper amount of water can be made into slurry.

3. water retention property is good, bond strength is high, no slippery fall during construction

4. has excellent weatherability, impact resistance and crack resistance.

 

Construction methods:

Base treatment: the surface dust and oil pollution of the base surface must be cleaned, so as to avoid the bond strength.

The binder is thickened by water. The water is 1 and the dry powder is 4 to 4.5. When the theoretical content is about 3 6kg/m2, the coating is about 4 to 5mm. The adhesive is fully stirred evenly, and the adhesive is thickened for 5-10 minutes. At this time, the mixture will be thickened later. Will mix the insulation board with special adhesive mud plate onto the insulation board or the back of the concrete base surface, paste compacting paving, lining, wipe the surface clean.

Matters needing attention

 

1. the construction temperature of 5 DEG C - 35 DEG C, the wind is not more than 5, in the construction process should avoid the rain;

2. the mixed material should be used in 2 hours, and should not be stirred again or add water and other materials.

3. unsealed and dry place is not opened, and the shelf life is 6 months.


?
版權(quán)所有©加樂士(中國)建材有限公司     豫ICP備19023147號-2 技術(shù)支持:新云搜    后臺入口
聯(lián)系電話
掃一掃

掃一掃
微信二維碼

免費服務(wù)熱線
400-688-6905

返回頂部